Log in
Hanoi

Investment in Hanoi’s urban railway line No.2 to increase by US$650 million

The No.2 urban railway line is expected to play a crucial role in the public transportation network, easing the ever-increasing severe traffic congestion in the capital's central area.

In its latest proposal to the Government, the Hanoi People's Committee has proposed to increase the investment capital for the urban railway line No.2, section Nam Thang Long – Tran Hung Dao, by VND16 trillion (US$650 million) to VND35.58 trillion ($1.5 billion).

 Cat Linh - Ha Dong urban railway in Hanoi. Photo: Viet Linh/The Hanoi Times

The project’s feasibility study report was approved by the Hanoi People's Committee in November 2008. The railway line was originally expected to be operational by 2015, but the completion timeline has continuously been revised.

In terms of construction scale, the total length of the route remains the same as previously approved at 11.5 kilometers. However, the lengths of the elevated and underground sections have been adjusted. Specifically, the elevated section has increased from 8.5 kilometers to 8.9 kilometers, while the underground section has decreased from 3 kilometers to 2.6 kilometers.

Simultaneously, in this proposal, Hanoi expected the project to be operational by 2029, with the following two years dedicated to operation and maintenance training.

Additionally, the Hanoi People's Committee stated that the plan to construct the underground station C9 beneath Dinh Tien Hoang Street – a key component of the project, which is located in front of the Hanoi Power Corporation, the Northern Power Corporation, and the headquarters of the Hanoi People's Council and People's Committee, only adjusts the position of the station body and its structure to ensure technical safety within the corridor of the route.

Along with this, the construction plan for station C9 does not violate the Hoan Kiem Lake Heritage Protection Zone II, does not affect the safety of cultural structures, and preserves historical, cultural, and architectural values.

According to Conclusion No.49 of the Politburo, Hanoi is tasked with completing nearly 405 kilometers of urban railway over the next 12 years, requiring a budget allocation of approximately $37 billion.

A report from the Hanoi Urban Transport Management Board stated that station C9 has been reevaluated with three location options, taking into account feedback. Among these, option 1, after adjustment, has been submitted to the Prime Minister. In this scenario, underground station C9 will be located outside Protection Zone II of Hoan Kiem Lake's heritage, constructed as a 4-tier stacked station. The structure of the station body aligns with the boundary of Protection Zone II, with a length of 202.4 meters, a width of 15 meters, and a depth of approximately 31 meters.

The station is situated on a curve with a radius of 800 meters, below Dinh Tien Hoang Street, in front of the Hanoi Power Corporation, the Northern Power Corporation, and the headquarters of the Hanoi People's Council and People's Committee.

The station will be equipped with two access points at the originally proposed locations. To provide sufficient space for the cooling tower, a 13-meter-high ventilation system, and a power generator room, an additional 705 square meters of land will need to be acquired from the Hanoi Power Corporation (an increase of 260 square meters from the original proposal). Additionally, approximately 25 square meters of land will be taken from the Hanoi People's Council and People's Committee to ensure smooth construction.

Project No.2 of the urban railway system - Noi Bai - Nam Thang Long - Hoang Hoa Tham - Bo Ho - Hang Bai - Dai Co Viet - Thuong Dinh plays a crucial role in connecting Noi Bai Airport to the city center, serving as a central axis and connecting with the beltway.

The project has a length of 11.5 kilometers, of which 2.6 kilometers are elevated and 8.9 kilometers underground, with 3 elevated stations (C1 to C3) and 7 underground stations (C4 to C10). The project utilizes ODA funds from Japan and was approved by the Hanoi People's Committee in the Feasibility Study Report under Decision No. 2054/QD-UBND on November 13, 2008.

The No.2 urban railway line is expected to play a crucial role in the public transportation network, alleviating the worsening traffic congestion in the central area of the capital.

Reactions:
Share:
Trending
Most Viewed
Related news
Thủ khoa, á khoa thi đánh giá tư duy đợt 2 tiếp tục đến từ Trường chuyên Bắc Ninh

Thủ khoa, á khoa thi đánh giá tư duy đợt 2 tiếp tục đến từ Trường chuyên Bắc Ninh

Trước đó, Vũ Minh Đức - học sinh lớp 12 toán 2 Trường THPT chuyên Bắc Ninh - trở thành thủ khoa kỳ thi đánh giá tư duy đợt 1 với 98,61/100 điểm - đây là điểm số cao nhất từ trước tới nay, xô đổ mọi kỷ lục của các thủ khoa những năm trước.

Vietnam strengthens semiconductor ties with SEMI SEA

Vietnam strengthens semiconductor ties with SEMI SEA

Vietnam is urging international organizations to connect global investors and experts with local businesses and research partners.

Tôi khổ vì nhà đẻ, hạnh phúc vì nhà chồng

Tôi khổ vì nhà đẻ, hạnh phúc vì nhà chồng

Từ khi lấy chồng, tôi chỉ cần nấu ăn hoặc có khi chồng nấu, còn lại dọn dẹp nhà cửa, đi chợ, rửa chén, giặt đồ… đều do chồng làm.

Lợi ích đặc biệt của giá đỗ không phải ai cũng biết

Lợi ích đặc biệt của giá đỗ không phải ai cũng biết

Giá đỗ rất giàu vitamin, cung cấp protein và chất chống oxy hóa hỗ trợ sức khỏe, tốt cho nam giới.

Khởi đầu từ vấn đề của khách hàng - triết lý phát triển công nghệ của Grab

Khởi đầu từ vấn đề của khách hàng - triết lý phát triển công nghệ của Grab

(Dân trí) - Đối với công nghệ, cách tiếp cận của Grab luôn bắt đầu từ việc thấu hiểu vấn đề và nhu cầu thực sự của khách hàng để tìm ra giải pháp phù hợp.

Tài khoản Siêu lợi suất phù hợp khách hàng nào? - Báo VnExpress

Tài khoản Siêu lợi suất phù hợp khách hàng nào? - Báo VnExpress

Tôi kinh doanh cửa hàng gia dụng, tiền trong tài khoản thường xuyên giao dịch, vậy tôi có sử dụng tài khoản Siêu lợi suất được không? Hồng Nhung (36 tuổi, Kiên Giang).

Khách hàng có thể giao dịch dễ dàng cùng Techcombank tại hệ thống WinMart

Khách hàng có thể giao dịch dễ dàng cùng Techcombank tại hệ thống WinMart

Từ tháng 1-2025, chuỗi siêu thị/cửa hàng WinMart/WinMart+/WiN (thuộc WinCommerce) chính thức trở thành đại lý ngân hàng của Techcombank.

Global Student Fashion Week to make Hanoi a rendezvous of int'l young designers

Global Student Fashion Week to make Hanoi a rendezvous of int'l young designers

With the theme Sustainable Fashion, the event will demonstrate skillful design techniques, convey strong messages about environmental responsibility, recycling culture and application of technology in modern fashion.