Log in
Business

Bac Lieu Wind Power Plant generated over 20 million kWhs

Bac Lieu Wind Power Plant has generated more than 20 million kWhs since it came on stream nine months ago.

In May 2013, the first 10 wind turbines were installed with a combined design capacity of producing 56 million kWhs for the national grid.

On February 8, 2014, engineers began working on foundations to install 52 more wind turbines along the continental shelf of Bac Lieu city. All the new turbines, imported from the US, are scheduled to be put into operation in the fourth quarter of 2015.

Each turbine is made of titan steel, weighs over 200 tones, and measures 80 meters in height and 4 meters in diameter. They are supplied by the US firm General Electric (GE).

The new turbines will help increase the wind power output 16fold by 2015.

The Bac Lieu wind farm was built in Vinh Trach Dong village, Bac Lieu City, at a cost of more than VND5.2 trillion.

A total of 62 turbines with maximum capacity of 99.2MW are expected to generate around 320 million kWh per year.

Reactions:
Share:
Trending
Most Viewed
Miền Bắc, Hà Nội thay đổi hình thái thời tiết, nồm ẩm sắp quay trở lại

Miền Bắc, Hà Nội thay đổi hình thái thời tiết, nồm ẩm sắp quay trở lại

Kinhtedothi - Trung tâm Dự báo khí tượng thủy văn Quốc gia cho biết, dự báo thời tiết hôm nay 19/3, hình thái thời tiết ở miền Bắc có sự thay đổi sau những ngày đón không khí lạnh tăng cường.

Hanoi Metro partners with ride-hailing providers for public transport convenience

Hanoi Metro partners with ride-hailing providers for public transport convenience

The cooperation aims to improve traffic management and develop smart transportation services in Hanoi, contributing to the progress of urban railway lines in Vietnam.

Local banks cut interest rates in response to PM’s request

Local banks cut interest rates in response to PM’s request

The rate cuts come in response to the Prime Minister’s directive to inspect and review banks that have recently increased deposit rates.

Hanoi revises up GRDP growth target to 8% in 2025

Hanoi revises up GRDP growth target to 8% in 2025

The city is committed to streamlining its organizational structure to be more efficient while ensuring that reforms do not disrupt residents or business operations.

Standards challenge Vietnamese exports amid tighter market regulations

Standards challenge Vietnamese exports amid tighter market regulations

Vietnam lacks specific standards for key agricultural export products, complicating outreach and inspection efforts.

Vietnam eyes top 3 in investment environment in ASEAN next 2 years: Party Chief

Vietnam eyes top 3 in investment environment in ASEAN next 2 years: Party Chief

A key objective is to trim off at least 30% of administrative procedures and cut both business costs and unofficial fees.

Vietnam set to have digital banks within financial centers

Vietnam set to have digital banks within financial centers

Credit institutions headquartered in these financial centers will not be bound by restrictions on to foreign ownership or foreign investment conditions when providing services there or across borders.

Government-backed waste management startups to be launched

Government-backed waste management startups to be launched

By 2030, each province will have at least five models of senior-led waste collection and sorting.